
On Site Construction
Frame Erection
Panels are bolted together on site with any necessary hot rolled steel members. Prefabricated stair flights are also supplied and installed.
Intermediate Floors
Metframe can be supplied with 2 floor options:
Roof Structure
Metsec offer a choice of roof structures
Back To Metframe - Product List
Panels are bolted together on site with any necessary hot rolled steel members. Prefabricated stair flights are also supplied and installed.
Intermediate Floors
Metframe can be supplied with 2 floor options:
- Concrete floors
- Joisted timber floor cassette
Roof Structure
Metsec offer a choice of roof structures
- Timber trussed roof
- Steel purlin / joisted roof
- Lattice truss roof
- In-situ concrete roof
Back To Metframe - Product List
Metsec plc. Company Number 1551970 (England) Registered Office: Broadwell Road, Oldbury, West Midlands B69 4HF.
